New guard plan - update guard state when a circuit fails/succeeds
New guard plan summarized at https://lists.torproject.org/pipermail/tor-dev/2016-July/011234.html
- Update guard state when a circuit fails/succeeds
- Section ON_FAIL and ON_SUCCESS
- See entry_guard_register_connect_status()
- Unittest
- Show closed items
Activity
-
Newest first Oldest first
-
Show all activity Show comments only Show history only
- Andrea Shepard changed milestone to %Tor: 0.3.0.x-final
changed milestone to %Tor: 0.3.0.x-final
- Andrea Shepard added TorCoreTeam201611 component::core tor/tor isaremoved milestone::Tor: 0.3.0.x-final nickm-deferred-20161005 nickwants029 owner::nickm parent::19877 points::3 priority::medium resolution::implemented severity::normal sponsor::U-must status::closed tor-guards-revamp type::task version::tor unspecified labels
added TorCoreTeam201611 component::core tor/tor isaremoved milestone::Tor: 0.3.0.x-final nickm-deferred-20161005 nickwants029 owner::nickm parent::19877 points::3 priority::medium resolution::implemented severity::normal sponsor::U-must status::closed tor-guards-revamp type::task version::tor unspecified labels
Trac:
Milestone: Tor: 0.2.9.x-final to Tor: 0.2.???
Keywords: N/A deleted, isaremoved addedBatch modification: I believe these are all (or nearly all!) required for the successful completion of the SponorU guards task.
Trac:
Keywords: N/A deleted, nickwants029, tor-guards-revamp addedTrac:
Cc: N/A to asnTrac:
Milestone: Tor: 0.2.??? to Tor: 0.2.9.x-final
Sponsor: SponsorU to SponsorU-mustDeferring more things -- even ones I love -- to 0.3.0. Please argue if I'm wrong.
Trac:
Keywords: N/A deleted, nickm-deferred-20161005 added
Milestone: Tor: 0.2.9.x-final to Tor: 0.3.0.x-final- Author
Reassigning some prop 271 tickets to nickm for parallel work in Oct.
Trac:
Status: new to assigned
Owner: N/A to nickm The backend for this is now in my (much-rebased, very unstable) prop271 branch (called
prop271-wip
). But it isn't tied together yet.Trac:
Keywords: N/A deleted, TorCoreTeam201611 added(batch change): These are now done in my prop271-wip branch.
Trac:
Resolution: N/A to implemented
Status: assigned to closed- Trac closed
closed
- Trac changed time estimate to 24h
changed time estimate to 24h
- Trac moved to tpo/core/tor#19882 (closed)
moved to tpo/core/tor#19882 (closed)